
phone: (+1) 432-687-5445 email:
jeff@jeffweber.net
|
 |
|
 |
|
 |
|
|
 |
Acidizing/Fracing
Amine Plants
BOP/Accumulators/Closing
Buildings/Living Quarters
Casing/Casing Tools
Cementing Equipment
CO2 Plants
Coiled Tubing
Completion Systems/Tools
Compressors
Cranes
Drilling: Bits/Hole Openers
Drilling: Blocks/Hooks/Swivels
Drilling: Collars
Drilling: Drawworks/Brakes
Drilling: Drill Pipe
Drilling: Fluids And Muds
Drilling: Kelly/Bushing/Valves
Drilling: Masts/Substructures
Drilling: Mud Conditioning
Drilling: Mud Pumps/Fluid Ends
Drilling: Rigs
Drilling: Rot.Tables/Bushings/Slips
Drilling: SCR
Drilling: Stabilizers
Drilling: Subs
Drilling: Top Drives
Elevators
Engines
Fishing Tools
Flanges
Flowline
Generators
Hangers: Tubing/Casing
Heads: Tubing/Casing
Instrumentation
Line Pipe
Meters
Miscellaneous
Nitrogen
Offshore Equipment
Packers
Pipeline Equipment
Production Packers
Pumping Units/Artificial Lift
Pumps/Fluid Ends
Separators
Spool/DSA/Cross/T/Elbow/Swivel
Subsea Equipment
Tanks
Tongs
Transmissions
Tubing
Valves/Chokes/Actuators
Well Monitoring Equipment
Well Service/Workover
Well Test
Wellhead Equipment
Wireline
Xtree Assemblies
|
 |
| Refurbished Amine Gas Processing Plant for Sale. Priced to Sell! | | Listing ID: 0750 | Vendor Stock No.: | | Price: Priced to Sell! | Date Posted: 09/08/09 | | Quantity: 1 | | Condition: refurbished | | Location: Houston Texas USA |
| | Description: | This amine plant is owned by a company currently developing a small gas field in south west Russia. Associated with this development, they have procured a second-hand Amine Plant from Natco which now may be surplus to their requirements. Plant modification has just been completed at two of the original manufacturers yards in Texas and it is now ready for shipment. The throughput of this particular project is 40mmscfd (1.14Nm3/d) with an inlet pressure of around 60 bar. In this case, it is largely H2S that is removed but some CO2 will also be stripped out. The plant has been modified for service in Russia, specifically this impacts the motors to accommodate the voltage, cycle and phase requirements (same as for Europe). The plant contains little by way of instrumentation and controls as these were going to be added in Russia. GOST requirements are met and there is full documentation available. The plant has flexibility as 6 of the original 20 trays have been removed, and generally replaced all of the pumps and motors. The package has Process Guarantees related to the application, and also limited Warranty that started form being due for delivery earlier this year. Further information and photographs of additional parts of the package can be made available if required. For your information: 1. Our Client is looking for offers. Of the refurbishment costs, US$500,000.00 of the price was to convert all motors from 60 to 50 Hz – this has been achieved with new motors and pump packages 2. Manufacturer states that current replacement is around US$4.0MM Our Client will consider ‘best offer’ on the basis of ‘as is, where is’ Houston Texas USA. | | Seller: | | | Images: | 
| 
| 
| 
| 
| 
| 
| 
|
|
 |
Weber Systems Inc. is in no way affiliated with any of the any companies referenced in this web site. Any references and or mention of company names in this web site or the accompanying computer code are for identification purposes only and are not Trade Marks or Trade Names used by or affiliated with Weber Systems Inc.
Weber Systems is the leading online destination for buying and selling new, used and rebuilt amine and gas plants and equipment such as: separators, dehydrators, compressors, treater, line heaters, flare stacks, amine contractors, CO2 analyzers, H2S analyers. Contact Jeff Weber at 432-687-5445 or email jeff@jeffweber.net. |
 |
|
|
|